In construction, efficiency isn’t just about what happens once the crew shows up. It begins long before the first nail is driven — with how your framing materials are ordered, organized, and delivered. Builders across West Michigan are learning that investing in structured framing packages can significantly reduce waste, speed up production, and eliminate costly jobsite confusion.
At CMS, we’ve seen it firsthand. When materials arrive jumbled, with lumber for multiple stages piled together, crews spend unnecessary hours sorting, restacking, and moving inventory just to begin work. This doesn’t just eat time — it increases the risk of damage, misplaced materials, and frustration that slows down the whole job.
A smart framing package solves that. We work with builders to break down deliveries by phase — sill plate and floor system first, followed by wall framing, then roof framing and sheathing. Each load is packaged with clear labels, stacked for minimal handling, and scheduled to align with your actual build progression. This reduces congestion on the jobsite, improves material visibility, and ensures the right products are in the right place at the right time.
Just as important, phase-based deliveries reduce the risk of weather exposure. Instead of leaving entire framing packages sitting in the snow or rain for weeks, we stage material to arrive when it’s needed. Less exposure means fewer warped studs, fewer rejected pieces, and a cleaner final product. Builders who’ve made the switch report smoother inspections, better-quality finishes, and faster dry-in times.
Organized framing packages also boost crew productivity. When framers aren’t wasting energy searching for materials or climbing over piles of unused lumber, they can focus on speed and precision. Pre-staged hardware, fasteners, and blocking materials remove friction and keep crews moving. It’s a simple shift in logistics that can save days off your timeline and reduce your labor spend — especially when projects stack up in busy seasons.
And it doesn’t stop at framing. Coordinated packaging can be applied to flooring, cabinetry, siding, and trim — anything that benefits from just-in-time delivery and reduced jobsite clutter. CMS helps our clients plan delivery cadences and jobsite layout strategies that support clean workflow and reduce crew burnout.
The bottom line? A better framing package is a better building experience — faster, safer, and more profitable.
Want your next framing package staged for success?
📞 Contact Construction Material Specialists — we’ll help you build smarter from the first delivery.
We're delighted to speak with you!
{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}