Labor shortages and rising costs make one thing clear: simply adding more people isn't always an option. The builders who continue to thrive are those who know how to get more done with the team they already have.
But this doesn’t mean pushing workers harder. It means working smarter — reducing downtime, eliminating inefficiencies, and improving flow on every jobsite.
The biggest productivity killer on any jobsite? Waiting.
Waiting for materials. Waiting for instructions. Waiting for the next trade.
To fix it:
Create 2–3 week lookahead schedules for every active job
Identify dependencies between trades and build in handoff buffers
Review weekly with your team so everyone knows what’s next
Tip: Use shared calendars or whiteboards to keep priorities visible — especially on multi-crew sites.
If your team shows up ready to work but spends the first hour hunting down materials or hauling tools, you’re wasting labor dollars.
To avoid this:
Deliver materials the day before, not the morning of
Set up job boxes with essentials ready to go
Store tools close to the active work zone and minimize movement between tasks
Every 15-minute delay across a crew adds up to hours lost each week.
Fixing work that should’ve been done right the first time is a massive drain on time and morale.
Combat this by:
Building in checkpoint inspections at key stages (e.g., framing, rough-in, finish)
Assigning a lead or foreman to walk the jobsite at the end of each day
Creating punch list templates for common problem areas
Catch issues early, and crews stay productive — not frustrated.
Technology is only helpful if it’s simple, accessible, and adopted.
Tools that work well in the field:
Daily logs via mobile apps for tracking time and tasks
QR codes on plans or walls linking to updated drawings
Shared cloud folders for current scopes, selections, or photos
Avoid overloading your team — stick to what helps them get work done faster, not what adds admin burden.
When crew members are stuck waiting on someone else to complete a task, production slows.
Solution: Train team members in multiple task types.
For example:
A framer who can also lay subfloor
A laborer who can prep trim packages
A finisher who can punch small items
This flexibility keeps work moving and builds a more resilient team.
Bringing work off-site into controlled environments saves field time.
Common prefab opportunities:
Framing panels or trusses
Stair systems
Blocking assemblies for kitchens or baths
Even simple steps like pre-assembling materials or bundling by task can shave hours off your install time.
Recognize crews for productivity, not just attendance.
Track and share:
Projects finished ahead of schedule
Team members who hit their task targets
Subcontractors who show consistent efficiency
This shifts the culture from “clock watching” to performance pride.
You don’t need a bigger crew — you need a better system. Builders who amplify productivity through smart scheduling, staging, and training unlock growth without burnout.
At CMS, we help maximize every workday by getting the right materials to the right place — on time, labeled, and jobsite-ready. Because when your team is equipped, they’re unstoppable.
Need material deliveries and service that keep your jobsites running efficiently?
📞 Contact Construction Material Specialists in Grand Rapids — we’re built to support builders like you.
We're delighted to speak with you!
{"one"=>"Select 2 or 3 items to compare", "other"=>"{{ count }} of 3 items selected"}